Matrix
Klarke's C/C++ Home
posts - 61,comments - 0,trackbacks - 0

EDI: Encounter Digital Implementation
CTS: Clock Tree Synthesis
WNS: Worst Negative Slack
TNS: Total Negative Slack
ECO: Engineering Change Order

Reassembly:

STA sign-off: Static Timing Analysis

DRC sign-off: Design Rule Checking

DRV sign-off: Design Rule Verification

LVS sign-off: Layout Versus Schematic-Electronic Circut Verification

 

OCV: Open Circut Voltage

IPO: In Place Optimization

FCPA: Foreign Corrupt Practices Act

NUMA: Non Uniform Memory Access

MIB: Mixed Interface Bloblet

LSF: Load Sharing Facility


Silicon Signoff and Verification (SSV)
Encounter Timing System (ETS)
Encounter Power System (EPS)
Physical Verification System (PVS)

posted on 2010-09-14 11:07 Klarke 阅读(335) 评论(0)  编辑 收藏 引用

只有注册用户登录后才能发表评论。
网站导航: 博客园   IT新闻   BlogJava   知识库   博问   管理